You can perform system migration by changing the server by following the steps below.
However, middleware and OS settings are also required, so please check and verify thoroughly under your responsibility.
Also, be sure to create a backup when migrating.
1. Stop the current intra-mart AccelPlatform system (all servers in a distributed environment).
2. When migrating a database, migrate all tables in the system database and all tenant databases.
In some environments, the system database and the tenant database are created in the same schema.
3. When migrating storage, migrate the items under the storage root path setting (root-path-name) under conf/storage-config.xml.
https://document.intra-mart.jp/library/iap/public/configuration/im_configuration_reference/texts/im_core/storage-config/index.html
In addition, if a storage path is set in the tenant environment information for each tenant, items under the storage path will also be migrated.
4. Please refer to the following documents when you want to migrate Solr server as well.
https://document.intra-mart.jp/library/iap/public/im_contents_search/solr_administrator_guide/texts/operation/index.html#migration
5. For Cassandra migration, please refer to the Cassandra document.
6. Make various settings in accordance with the change in the environment.
Change the settings referring to the following.
https://global.intra-mart.support/hc/en-us/articles/16220484825497
7. Modify middleware (web server or load balancer) settings for migration.
8. Install and configure the application server (such as Resin) in the new environment.
9. Create a war from the IM-Juggling project that you changed in 6 and deploy it.
10. Please refer to the document of each external linkage function for other changes due to the change of the external linkage destination.
-- Target ----------------------------------------------------------------------
iAP/Accel Platform/All Updates
--------------------------------------------------------------------------------
FAQID:1239