Is it possible to change the status of a job net from “Proceeding” to “Success”?

 
After AccelPlatform is stopped (job scheduling service is stopped ) while a job net (job) is being executed, the status of the job remains "Executing" when you refer to the job net being executed on the job net monitor at the time when it is restarted. 
At that time, the status of the job net remains "End requesting" even if you  try to stop the target job net (Unable to stop it again neither).

This occurs because the job scheduler service receives a stop command, but status cannot be moved from "End Requesting" because the process of the corresponding job does not already exist.
Even if the job net (job) is not allowed to be executed in parallel, the job net (job) can be executed successfully because it has already been stopped.
It is not affected if the status of the job net remains "End Requesting".
Please avoid stopping the service while the job is being executed.

This problem is fixed in 2015 Spring(Juno).
https://issue.intra-mart.jp/issues/4965
The status at the end is treated as "error".

-- Target ------------------------------------------------------------------------
iAP/Accel Platform/2012 Autumn(Alba)
iAP/Accel Platform/2012 Winter(Bourbon)
iAP/Accel Platform/2013 Spring(Climbing)
iAP/Accel Platform/2013 Summer(Damask)
iAP/Accel Platform/2013 Autumn(Eden)
iAP/Accel Platform/2013 Winter(Felicia)
iAP/Accel Platform/2014 Spring(Granada)
iAP/Accel Platform/2014 Summer(Honoka)
iAP/Accel Platform/2014 Winter(Iceberg)
---------------------------------------------------------------------------------





FAQID:375
Was this article helpful?
0 out of 0 found this helpful
Powered by Zendesk