How do I export/import a project in e Builder?

 
[Handling method]
With e Builder, migration is possible by using the export/import function of the base Eclipse.
The instructions are as follows.

<How to export a project>

(1) Right-click in the Project Explorer and select "Export".
(2) Select the following according to the format you want to export.

- When exporting using file system
 ・ Select "General" - "File System" and click the "Next" button.
 ・ Set any directory to be output in the "To directory" field.
- When exporting as using archive file
 ・ Select "General" - "Archive File" and click the "Next" button.
 ・  Set any file path to be output (archive file name) in the "To archive file" field.

(3) Select the project to export.
(4) In the "Option" field, select "Create file directory structure" and press the "End" button.

<How to import a project>

(1) Right-click in the Project Explorer and select "Import".
(2) Select "General" - "Existing project to workspace" and click the "Next" button.
(3) Select the following according to the format of the project when exporting.

- For a project exported using file system
 ・ Select the "To directory" set when exporting in the "Select route directory" field.
- For a project exported using archive files
 ・ Select the "To archive file" set when exporting in the "Select archive file" field.

(4) Select the project to import.
(5) In the "Option" field, select "Copy project to workspace" and click the "End" button.


--Target-------------------------------------------------------------------------
iAP/Accel Platform/All Updates
--------------------------------------------------------------------------------

FAQID:1408
Was this article helpful?
0 out of 0 found this helpful
Powered by Zendesk